New bridge over Sandy Creek

The project required the demolition of the existing timber bridge design and construction of a new concrete bridge to be installed and commissioned on a main road, at Sandy Creek, Guyra NSW using precast Hume decks and in-situ potted pile methods.

Scope of works

  • Design
  • Demolition
  • Piling
  • Slope stabilisation
  • Gabion Baskets
  • Pre Cast bridge construction
  • Coffer dam
  • Pavements

Project snap shot

  • Location: MR135 Guyra NSW
  • Client: Guyra Shire council