The project required the demolition of the existing timber bridge design and construction of a new concrete bridge to be installed and commissioned on a main road, at Sandy Creek, Guyra NSW using precast Hume decks and in-situ potted pile methods.
Scope of works
Project snap shot
February 23, 2016