JNC Group was contracted to complete reconstruction stabilization works to a stone laid wall completed in the early 1900’s, The wall had suffered significant damage from multiple storm damage events over the years, JNC Group bid was successful with significant controls to limit pollution and methods to the Serpentine River, proposed work methodology to minimize disturbance measure to the structure.
Scope of works
Project snap shot
February 23, 2016