Sandy Creek bridge

New bridge over Sandy Creek

The project required the demolition of the existing timber bridge design and construction of a new concrete bridge to be installed and commissioned on a main road, at Sandy Creek, Guyra NSW using precast Hume decks and in-situ potted pile methods.

Scope of works include:

 

  • Design
  • Demolition
  • Piling
  • Slope stabilisation
  • Gabion Baskets
  • Pre Cast bridge construction
  • Coffer dam
  • Pavements
Project snap shot:

 

Location: MR135 Guyra NSW

Client: Guyra Shire council

Value: $440,000

Date
Category
Civil, Infrastructure